Vonnue EuropeBack to capacity management
Interactive demo · Sample data

Thu 09:00

Chapter 1The moment

Thursday, 09:00. Six people, four tools open, an hour and a half.

Nordwind Studio, the fictional agency in this demo, plans the coming week every Thursday: twelve people, six client projects and one plan in Float. This is what weekly planning looks like in many agencies.

AI outputs and system connections are simulated.Try it now

Chapter 2The idea

AI prepares for the meeting

It reads the plan in Float and adds information from sources outside it: logged hours, calendars and email.

The result is an agenda for Thursday's 09:00 meeting to plan the following week. The team makes the decisions.

After approval the result goes back into Float.

An extension for Float that works with your existing plan without replacing it.

  1. 1Float plan (Wed 18:45)
  2. 2Briefing (Thu 08:12)
  3. 3Meeting (Thu 09:00)
  4. 4back into Float

Thu 08:12

Chapter 3The briefing is ready

What has happened since the last meeting

An absence, a request for an earlier launch and an additional retainer request. The briefing was ready at 08:12, just under an hour before the meeting.

Sources

  • Float plan

    • Weekly plan, as of Wednesday 18:45
    • Development blocks on Thursday and Friday
  • Time tracking

    • Hours logged on Hafenwerk up to Wednesday
    • Development hours logged on Hafenwerk
  • Email

    • Message from Hafenwerk, Wednesday 18:12
    • Check-in notes, Wednesday 16:20
  • Calendar & absences

    • Absence updated, Wednesday 11:40

Agenda

  1. Absence: Mara P. is unavailable from Monday to Wednesday

    Absence
    18 h unstaffed
  2. Deadline moved up: Hafenwerk wants to go live on Wednesday

    Deadline
    12 h of work scheduled after the new launch date
  3. Scope change: Grünstrom Energie needs 12 h of video editing

    Scope
    12 h not planned

Nothing in the plan has changed up to this point.

Thu 09:00

Chapter 4Your turn

The meeting, item by item

Work through three items as you would in a meeting: review the options, decide or defer.

Weekly Briefing · Nordwind StudioThu 08:12

Absence: Mara P. is unavailable from Monday to Wednesday

Mara P. is unavailable from Monday, 17 August, up to and including Wednesday, 19 August. Her absence was updated on Wednesday. That leaves 18 h to reassign: 12 h of design for Hafenwerk and 6 h for Lindenhof.

Options

  • A

    Redistribute within the team

    Team
    Plan
    Frida L. takes on the 12 h of Hafenwerk design on Monday and Tuesday, and Chiara M. takes the Lindenhof block on Wednesday. Both have capacity available on those days.
    Utilisation
    Frida L. 60% → 90%
    Things to consider
    Frida L. has just 4 h left in the week to handle any follow-up questions from Nordbahn.
  • B

    Bring in a freelance designer

    External
    Plan
    The 12 hours of Hafenwerk design on Monday and Tuesday are provisionally assigned to a freelance designer, pending her confirmation. Chiara M. takes the Lindenhof block on Wednesday. Frida L. sets aside 2 hours for briefing and sign-off.
    Cost
    €1,140 (12 h × €95/h)
    Things to consider
    Availability from Monday has been requested. Aylin K. will obtain confirmation by Fri 14 Aug, 09:00.
  • Defer

    Follow-up
    Plan
    The plan stays as it is. The 18 h on Hafenwerk and Lindenhof remain unstaffed. No one currently knows whether Mara P. will be back on Thursday.
    In the minutes
    Follow-up Friday 09:00: confirm availability from Thursday and reassign the 18 h.

Plan excerpt for Item 1, week from 17 Aug, as of Thursday 08:12

Plan excerpt for Item 1, week from 17 Aug, as of Thursday 08:12
PersonMon17 AugTue18 AugWed19 AugThu20 AugFri21 Aug
DeadlinesHafenwerk launchColibri launch
Mara P.Design · 40 hUnavailable8 hUnavailable8 hUnavailable8 hLindenhof8 hNordbahn6 h
Frida L.Design · 40 hNordbahn2 hNordbahn2 hNordbahn6 hNordbahn6 hColibri6 hInternal2 h
Chiara M.Design · 32 hColibri8 hColibri8 hPapierboot8 h
UnassignedExternalHafenwerk6 hHafenwerk6 hLindenhof6 hGrünstrom12 h

The excerpt shows only the people this item affects. Days unrelated to this item are dimmed.

Minutes

Thursday, 13 August 2026, 09:00

  1. 1 · Absence

    open

  2. 2 · Deadline

    open

  3. 3 · Scope

    open

3 items, 0 selected, 0 deferred.

Available once a decision has been made or deferred on every item. Still unresolved: Item 1, Item 2 and Item 3.

This demo makes no changes to external systems. All changes stay in the browser.

Thu 10:30

Chapter 5The result

Back into Float

The workflow applies approved plan changes, including any conditions and a note from the meeting. The people affected receive the relevant tasks. Conditions that still need to be met and deferred items keep their assigned owners and follow-up dates. Updates to other systems are simulated in this demo.

All figures are synthetic.

The demo makes no changes to external systems; everything stays in this browser.

The design of this demo is modelled on Float. Float is a product of Float.com. There is no affiliation with Float and no Float logo is used.

Back to capacity management

Go to the project knowledge demoGo to the editorial planning demo